Dalian LNG Terminal Station Project (Phase I and II)

●  The first phase is 3 million tons per year, the  gas supply capacity designed is 4.2 billion cubic meters per year; the second phase is 6 million phase tons per year, and the gas supply capacity designed is 8.4 billion cubic meters per year. 

●  The project includes LNG dock ,unloading arm, LNG storage tank (three tanks , 160 thousand square ), LNG booster pump, carburetor, BOG compressor, natural gas transmission , LNG truck loading ,LNG vessel loading and auxiliary facilities.

●  Win the Gold medal of 2013 Petroleum Quality Engineering , this is the only LNG project win the award of China. 

●  The partial  cryogenic top-entry ball valve, check valve and globe valve used for this project  supplied by Sanbora Valve co .,ltd .